debugging Hydraulic station Factors to consider:

In fact, there are three main factors to be considered in small hydraulic station: hydraulic pump and hydraulic pressure station.

1. The first is the oil circuit of small hydraulic station

In general, there is an overflow valve at the beginning of the hydraulic oil circuit to prevent the valve and other components from being damaged by excessive pressure, which plays a protective role. The oil circuit value of small hydraulic station is lower than the maximum working pressure of hydraulic components.

2. The second is the pump of hydraulic station

If the pump of the hydraulic station is in line with the pressure of the oil circuit, it is generally not necessary to debug.

3. Finally, adjust the circuit pressure of the hydraulic station

The circuit pressure of the hydraulic station is adjusted slowly according to the needs, and the in and out speed of the oil cylinder can be adjusted according to the production efficiency.

Use rules of hydraulic station:

1. In case of oil leakage and other abnormal phenomena in the process of operation, stop the machine immediately for maintenance;

2. In order to prolong the service life of hydraulic oil, the oil temperature should be less than 65 ℃; check the quality of hydraulic oil every three months, and replace it once a year depending on the quality of hydraulic oil;

3. The liquid level of oil level gauge in oil tank shall be observed in time, and the hydraulic oil meeting the requirements shall be replenished in time to prevent the oil pump from being empty;

4. Clean or replace the oil filter regularly;

5. Keep the working environment of hydraulic station clean and tidy.